The best way to introduce an IBC container rack and train the workforce is to ensure that the induction is brief, repeatable and clearly defined in terms of roles. When the rack is introduced to a farm or as part of a property maintenance fleet, the greatest risks are usually associated with lifting, securing, hooking up hoses and emptying – in other words, precisely those points where haste and “this is how it’s done…”
Voit jättää meille soittopyynnön
Jätä nimesi ja numerosi, niin soitamme takaisin saman päivän aikana.
Commissioning of the IBC container rack and training for the work team works best when induction training is brief, repeated and clearly defined in terms of roles. When a forklift is introduced onto a farm or into a property maintenance fleet, the greatest risks are usually associated with lifting, securing loads, hose connections and emptying – in other words, precisely those areas where rushing and a “this is how it’s always done” mindset cause accidents and downtime.
In this article, you’ll find a practical 30-minute induction template suitable for both tractors and wheel loaders. The template is designed so that a new operator can learn at least the basic safety routine, whilst an experienced driver is reminded of critical checks. The examples are based on applications encountered in the day-to-day operations of Lootu Oy (Kempele, Pekurinpolku 3): irrigation and washing water, preservatives and liquid fertilisers.
Why should the introduction of an IBC container rack and training for the work crew be standardised?
A clear induction procedure brings predictability: the scaffold is erected and secured in the same way, regardless of who is carrying out the work. When work stages are standardised, there are fewer instances of the IBC moving around on the scaffold, hoses becoming pinched or valves being turned to the wrong position. In property maintenance and contracting in particular, work sites change frequently, and “minor” errors quickly become apparent in the schedules.
Standardisation also involves a question of accountability. Once the induction process has been documented, it is possible to identify who provided the training, what was covered and who authorised the employee to work independently. This makes day-to-day management easier and reduces reliance on specific individuals during peak periods. From an occupational health and safety perspective, it is worth noting that in Finland, the basic occupational health and safety requirements stipulate that employees must be guided and inducted; for a general overview, you can refer, for example, to Health and Safety at Work-page.
The benefits of standardised induction training When the same 30-minute pattern is repeated, the risks and “tacit knowledge” become visible routines.
Less damage Locking, securing and hose-up must be carried out in the correct order.
Getting started more quickly A new employee is able to carry out basic tasks safely right from day one.
Fewer downtimes Leaks, broken connectors and kinked hoses are reduced.
Consistent documentation The checklist remains with the building site or farm and can be updated.
30-minute induction programme: Commissioning of an IBC container rack and training for the work team
The model shown below is designed to be towed behind a “gate” or next to a rack in a hall. All you need is the equipment (tractor/wheel loader), a rack, an IBC container, a basic hose and connectors. The aim is not to teach every possible detail, but to ensure the critical stages of the work are covered: lifting, securing, hosing and emptying, as well as safe final clean-up.
Divide the induction into four 7–8-minute sections and round it off with a 2–3-minute “show me” test. When the trainee carries out the steps themselves whilst the trainer watches, any mistakes are spotted straight away. If you wish to explore the subject of securing and the checklist in greater depth, the in-house guidance is a good resource for further reading: How do you attach an IBC container to a rack correctly?
| Minutes | Section | Success criterion |
|---|---|---|
| 0–7 | Lifting and placing on the rack | Load under control, no lateral sway; the rack positions itself correctly when secured |
| 7–15 | Locks and fastenings | All locks secured, safety checks carried out, movement on the scaffolding minimised |
| 15–23 | Hoses and fittings | The right connectors, the seals are OK, the hose isn’t pinched or kinked |
| 23–30 | Draining, follow-up procedures and testing | The valve is operated carefully, splashes are prevented, the workstation is tidy, and the operator demonstrates the steps themselves |
In practice, the best part of the induction is the “hands-on” section: lifting an empty or partially filled IBC in a safe area, securing the locks, connecting the hose and simulating the emptying process. When this is done at a leisurely pace, the same routine is carried over into the hectic day-to-day work from Kempele to Oulu and on to, for example, Liminka, Tyrnävä or Raahe.
A brief induction is only effective if it focuses on critical moments: lifting, securing and valve control account for 80 per cent of %-related injuries.
Lifting and securing: a routine that prevents falls and twisting of the torso
Lifting is the stage at which a mistake can quickly become costly: the load swings, the rack takes a knock or the IBC frame becomes twisted. That is why two things are always emphasised during induction training: lift in a controlled manner and ensure that the rack’s attachment (e.g. front loader or adapter) is correctly secured before lifting the load higher than is absolutely necessary.
Another common pitfall is the “lock assumption”: someone assumes the lock has engaged because it “looked” as if it had. Make it a habit to physically check the locks (by pulling on them) and to have another person confirm this a few times at the start. If you need some background on choosing a rack and attachment points, here’s some further reading: How to choose the right IBC container rack.
Lifting and securing – precise repetition of the induction procedures These points are always covered in the same order.
Level and space Choose a level surface, clear away any loose items and keep bystanders at a safe distance.
Slow lift To begin with, lift it just a few centimetres and check whether the load remains upright.
“Tensile test” for locks” Check by hand or by looking to ensure that the locks are actually engaged and that nothing is stuck in a halfway position.
Low ride height Let’s agree on one rule for the team: let’s drive as low as possible when moving.
Piping and draining: minimising leaks, splashes and downtime
Hose connection is often the point where rushing comes back to haunt you: the hose kinks, the connector doesn’t seal properly, the valve is opened too quickly, or the draining process is started before the receiving end is ready. During induction training, it is always worth demonstrating the “correct sequence”: first check the connectors and seals, then route the hose (avoiding any kinks), and only then open the valve in a controlled manner.
In property maintenance (e.g. Vaasa, Kokkola, Kajaani), long hoses are often used for washing and brushing tasks, which increases the risk of the hose getting caught under the wheels or kinked at a corner. On farms, on the other hand, draining may involve preservatives or liquid fertiliser, in which case splash control and the correct protective equipment are particularly important. A more detailed guide to selecting the right connector and hose sizes can be found here: IBC container valves, fittings and hose sizes in practice.
It is good practice to agree on a single, common “drain signal” for the work team: the valve must not be opened until the recipient has confirmed they are ready. This works just as well for washing down the yard as it does for dust suppression and sweeping. Once a procedure has been agreed, it reduces misunderstandings and improves quality, particularly when seasonal workers are involved in the work.
A brief note
If you’re carrying out induction training for a new team, make sure to introduce a single set of installation and operating instructions at the same time. This will save time on every shift.
Roles and division of responsibilities: who checks what, and when?
A clear division of responsibilities ensures that induction training works even when management is not present every day. In practice, you need at least three roles: (1) the user/operator, (2) the person in charge or site supervisor, and (3) a person responsible for maintenance (who may be the same as the supervisor in a small team). When everyone knows their part, “the scaffold isn’t working” situations are resolved more quickly and the information isn’t left in just one person’s head.
With racks such as those made by Lootu Oy, the idea is that they are easy to use without the need for special tools, but this does not eliminate the need for routine maintenance. For example, the condition of the locks, wear-and-tear parts and hose couplings require regular visual checks. It is also a good idea to agree on where the rack is to be stored, who is responsible for cleaning it (particularly after using preservatives) and where spare parts, such as seals, are to be kept.
The division of responsibilities in practice Define the roles so that every shift can operate to the same standard.
Driver Carry out a pre-drive check: locks, hoses, valve position, ride height.
Supervisor/Person in charge Approves the author’s access, maintains the induction list and records any deviations.
Maintenance Manager Regularly check for wear and tear on parts and damage to the surface finish, and ensure that spare parts are available.
Work partner (if required) Guides the lifting process, checks the area and confirms that emptying has begun.
Induction checklist for printing: “Before driving – At work – After work”
When Commissioning of the IBC container rack and training for the work team It can be done in 30 minutes; the key to success is a single sheet that travels with the fleet. The best place for the checklist is laminated and kept in the storage area for the trailer or in the tractor cab. The checklist must be practical: no long explanations, just items to be ticked off.
The template below is suitable for both farms and property maintenance. If you have multiple uses (irrigation water, washing water, preservative), please also add a cleaning and labelling routine for when the fluid is changed to the list. This will help prevent cross-contamination and incorrect hose connections, which can quickly become apparent, for example, in nozzles, pumps or on a messy worksite.
Before setting off: check the locks and any safety devices, ensure that no hoses or connectors are hanging loose, check that the valve is closed, and assess the route (potholes, camber). At work: Open the valve gradually, monitor the connections for the first few seconds, keep the work area tidy and handle the hose safely. After work: Close the valve, release the pressure if necessary, drain the hose, rinse thoroughly and move the rack to the agreed location. When everyone follows the same routine, the rack will last a long time and the work will go smoothly without any surprises.
If you also want to check this from the point of view of dimensioning and loading, I recommend reading a separate guide on the effects of loads: Weight and load of the IBC container, as calculated. This makes it easier to explain why ride height, tyre pressure and route choices are all part of a safe everyday life.
In conclusion: once an induction model has been properly established, it is easy to maintain. Lootu Oy assists with the selection and commissioning of racking systems from its base in Kempele, and our delivery service also covers the wider Oulu region as well as locations such as Vaasa, Joensuu, Kuopio, Liminka, Tyrnävä, Raahe, Kajaani and Kokkola.
Do you want a smooth roll-out without any downtime?
Lootu Oy can help you choose and set up an IBC container rack for use on farms and in property maintenance. Ask us for a plan of action and recommendations tailored to your equipment.
Frequently Asked Questions
Who is the 30-minute induction model suitable for?
What resources are needed to run an induction programme?
How can we ensure that the locks are actually fitted?
What is the best way to teach children how to use the toilet and flush it safely?
Who is responsible for day-to-day maintenance and inspections?
Interested? Get in touch with us!